After strictly implementing the epidemic prevention and control policy at Meishan Wharf ,Ningbo Port ,ships already in the port area or waiting to be shipped will continue to be operated on the 18th of this month. After the unlock from 25th Aug., the container pick-up service resumed in an orderly manner. And Meishan Wharf is estimated to be wholely recovered on September 1.
In the last 2 weeks,many export orders were delayed due to the lock of Ningbo Port.Our exports also was influenced.But hopefully,it turned to normal from yesterday.
Besides the port lock,the shipping delay seems normal in 2021,because the early control of COVID and good recovery of production.So dear friends,if you are interested in fuse switch disconnector,fuse base,fuse holder,isolator switch,changeover switch,fuse,busbar systems,etc.. Welcome to inquiry from GRL and early order will be much appreciated.
Related News
- Too Hard To Find A Sea Shipment Container
- Made-in-China Products Are More And More Popular in Overseas Market
- GRL’s New Factory Sealed Its Roof Yesterday
- GRL Fuse Bases
- GRL RT Series Fuse Holder
- What Is The Difference Between Circuit Breaker And Disconnector?
- Learn OLYMPIC Spirit
- What Is A Switch Disconnector? How Does It Work?
- Disconnect Switch
- Higher, Faster, Stronger & Together--Tokyo Olympic Games 2021